Our work

Hard jobs. Done right. On the record.

Scope Guardian client work and structural jobs from my building career. For each one: the problem, what I did, and how it turned out.

Scope Guardian shield

Scope Guardian client work

Recent engagements

Client names, addresses, and contractors are never published. Sample reports are redacted and shared with permission.

More client write-ups will be added as each job is cleared for publication. See all sample reports

Field work

Structural work from the field

Completed 2024 and 2025. From my building career before Scope Guardian. This is where the judgment behind it comes from.

  • Toms River, NJ
  • Demolition
  • Occupied building

70-foot brick facade over a live parking garage

The challenge

A delaminating 70-foot brick veneer facade on an occupied commercial building, directly above an active parking garage. Three other contractors refused it because the garage would be destroyed during removal.

What I did

Engineered a top-down demolition with three aerial lifts (135-foot boom, 125-foot articulating, 46-foot boom), a custom 28-foot T-post bracing system, and a debris chute built from the existing gable wall. Confirmed insurance on all sides before mobilizing, planned for every failure mode and priced that protection into the bid, and worked with the project engineer throughout.

The outcome

No injuries, no damage to the parking structure, no rework.

  • Convalescent home
  • Windows
  • Residents in place

88 windows replaced from the inside

The challenge

Replace all 88 windows in an occupied five-story convalescent home, five stories down to the ground, while residents stayed in their rooms.

What I did

Installed every unit from the interior. Sequenced the work zones to keep disruption low and meet the facility's safety and cleanliness rules, checked each unit for performance and alignment, and handled the manufacturer's warranty paperwork and quality sign-off.

The outcome

First-pass inspection approval, finished ahead of schedule, zero disruption incidents.

Finished replacement windows in a bay, with autumn trees outside
Finished bay of new windows.
New double-hung window installed from the interior
New unit set from the interior.
Joseph Truglia standing beside newly installed windows
Me beside the new windows.
Window frame detail during installation
Frame detail during install.
  • Belmar, NJ
  • Structural beams
  • Two buildings

Beams set behind finished soffits

The challenge

Install three PSL beams (a 28-foot center span and two 18-foot flanks) behind existing soffits on two beachfront condominium buildings, with no exterior demolition.

What I did

Designed a lift system of 2x12 H-posts with sleeved bottle jacks to raise each beam from inside the structure. A telehandler set the beams, synchronized jacks raised them to final position, and 8x8 columns were trimmed in with the siding crew. Coordinated the framing, lift, and safety crews across both active buildings.

The outcome

Done safely and on schedule, no soffit removal, no rework.

  • New Jersey
  • Residential
  • Structural

First floor replaced with the house still standing on it

The challenge

A failing first-floor assembly had to be replaced without removing the walls above it, as the homeowner asked.

What I did

Built a temporary support system of whalers, bottle jacks, H-posts, and PSL beams that carried the second story, raised it more than 5 inches while holding alignment, and let the old floor system come out and the new one go in. Coordinated the design with the engineer and the field crew.

The outcome

Full structural restoration, on schedule, with the finished spaces above undisturbed.

  • Residential
  • Foundation
  • Crawlspace

Settling house stabilized from the crawlspace

The challenge

A house showing settlement and beam deflection, with live HVAC, plumbing, and electrical running through a tight crawlspace.

What I did

Added new load-bearing columns and adjustable galvanized post assemblies, then used precision jacking to relevel the structure. Inspections after the work confirmed better load distribution.

The outcome

Leveled and stabilized with no interior cracking or service interruption, and built so it can be adjusted and inspected later.